Interface Management

The interfaces need to managed to ensure that the design can be optimized with respect to all parties (Fabrication, pile installation, jacket installation, cable installation, turbine O&M) requirements.

Based on experience with different wind turbine manufacturers and different software, OWEC Tower propose reliable and efficient method statement for the substructure global analysis with the wind turbine manufacturer.

Based on previous projects, OWEC Tower offer a variety of solutions for the secondary steel (J/I-tubes, boat landing, anodes, pile stoppers) at an early stage.

Based on its Quattropod concept, OWEC propose a method statement and design limitations for the piles, jacket and grout installation at an early stage.

During the detail Design Process, OWEC Tower prepare Interface Datasheet, sketches and Method Statements to facilitate the discussion with the parties involved and the decision making.