Ormonde

Foundations for offshore windfarm

First commercial deployment of OWEC Quattropod® in a large-scale wind farm. Pre-installed piles concept proven for large wind farms.

Responsible for detail engineering of piles, primary and secondary steel for WTG substructure. Follow-up of fabrication issues with the yard BiFab. The scope included the provision of all documentation needed for third party (DNV)’s approval including ULS, FLS and SLS calculations together with engineering drawings.

FSHORE WIND FARM COUNTRY FINAL CLIENT WATER DEPTHS INSTALLATION YEAR WIND TURBINE
Ormonde
(30 units)

UK (England)

ODE (Vattenfall)

21m

2010

REpower 5M